Waste Dumping System

waste-dumping-system

Waste Dumping System

The most common practice for industrial waste management is to unload the wastes manually by the means of manual labour which can be taxing on the employees. Thus, this system serves as one of the first few full buildings waste management system integrated to modern industrial building for the ease of unloading wastes.


Features:

A passage tunnel was built to link the waste disposal bin of every level together.

A gravity assisted travelling path was built as well to aid the clearing of the waste once they are disposed, this will allow smooth transition between disposal bin to main waste storage tank.

There is a fully automated disposal bin that will help the process of disposal and greatly improve the efficiency of the work done.